25 ton Top Running Double Girder Crane for Mine Maintenance Facility
Crane-Tec just completed the turn-key Design, Fabrication and Installation of a 25 ton long span crane for a mine maintenance facility in the Midwest. Crane-Tec was contacted by the General Contractor to supply drawing and assist I in the design phase.
Crane-Tec supplied and installed the overhead crane, crane rail and electrification on-time and to a satisfied customer.
Comments