Crane-Tec was selected by an international engine manufacturer to design, engineer, fabricate and install a 22.5 ton transfer crane system.

With our team approach, we were able to work alongside the customer to address the special challenges of this project.  The result?  A system that meets the stringent requirements of this particular industry.

Special Considerations:

  1. Very large capacity for transfer crane

  2. Independent runway and monorail structure

  3. Large runway spans and loads

  4. Low head room lift requirements required a low headroom hoist

Our Team Approach:

  1. Crane-Tec’s team consisted of our design engineer, structural engineer and project manager.  Together, we worked with the general contractor’s team and the structural engineer for this project.

  2. The Crane-Tec team designed a 22.5 ton, top running, double girder crane with a single transfer beam and eighteen, 15-ton interlocking transfer monorail beams.

  3. Our structural engineers designed the freestanding runway and monorail system.

Results:

The transfer crane and monorail system was installed, weight tested and adjusted to the customers stringent requirements.

Check out the video below to see the end-result for this project.