10 Ton Freestanding Overhead Crane Case Study


The Challenge:

To provide our customer, a carpenters training facility, with a freestanding runway system for a new facility in Indiana. The job incorporated (1) Ten ton top running single girder  overhead crane and complete freestanding runway systems.

Special Consideration:

The general contractor needed design build capabilities for runway systems. Single girder overhead cranes with low headroom hoists were utilized to minimize crane and foundation costs.  Crane-Tec engineers armed with building and foundation drawings designed a cost efficient and space saving runway system.

Results:

The general contractor maximized the space inside of the building.  Crane-Tec supplied a complete overhead crane system and the owner maximized floor space.  The cranes were completed and turned over to the customer ahead of schedule.