top of page
jphelan98

Case Study

Updated: Dec 15, 2020


The Challenge:

  1. To provide our customer, a leading forklift manufacturer, with a complete under running 12 ton overhead crane system. The job incorporated the 12 ton runway system and four under running overhead cranes.

Special Considerations:

  1. The customer needed design build capabilities for the overhead crane and runway system. Crane-Tec provided complete design of the under hung runway system and incorporated it into the customers metal building.

Our Team Approach:

  1. Our engineers, armed with building drawings, determined runway steel and hanger design. Engineered drawings with loads were submitted for approval. Crane-Tec’s experienced field crew installed the complete system and overhead cranes in under 4 days, allowing the customer to use the equipment in the installation of new machinery.

12 views0 comments

Recent Posts

See All

Commentaires


bottom of page