top of page
  • jphelan98

Rock Solid Case Study

Updated: Feb 22, 2021


We worked to provide our long-time customer with a 5-ton under running building supported crane system.


Crane-Tec helped design the material handling system to meet the needs of our customer’s new and innovative artificial stone manufacturing plant.


Special Considerations:

The crane system is to be used in conjunction with a cement batching plant and will deliver the hopper to the forming stations.

Our Team Approach:

Crane-Tec’s material handling specialist, working with the owner and general contractor and evaluated the customers manufacturing process. Several options were developed to enhance production and address safety concerns:

  • Radio remote control of the crane enables the crane to be controlled from the batching plant control platform.

  • Incorporate the Gar-Bro hopper controls with the crane controls.

  • Variable speed inverter-controlled bridge & trolley for precise locating of hopper.


Results:

Crane-Tec supplied the end user with a cutting edge 5-ton overhead crane system, providing safe and cost-efficient means for handling the Gar-Bro hopper to the forming stations. Check it out!



38 views0 comments
bottom of page