The Challenge:

To provide our customer, a carpenters training facility, with a freestanding runway system for a new facility in Indiana. The job incorporated (1) Ten ton top running single girder overhead crane and complete freestanding runway systems.


Special Consideration:

The general contractor needed design build capabilities for runway systems. Single girder overhead cranes with low headroom hoists were utilized to minimize crane and foundation costs. Crane-Tec engineers armed with building and foundation drawings designed a cost efficient and space saving runway system.


Results:

The general contractor maximized the space inside of the building. Crane-Tec supplied a complete overhead crane system and the owner maximized floor space. The cranes were completed and turned over to the customer ahead of schedule.

 
 
 