top of page
  • Crane-Tec

New ODOT Facility


When the States’ Department of Transportation needs an overhead crane system for their new vehicle maintenance facilities, they call on Crane-Tec.



The Challenge:

To provide the customer with a building supported crane system with a 5-ton top running single girder crane.



Special Considerations:

  • Precise handling of load

  • Ease of operation

  • Safe operation


Our Team Approach:


Crane-Tec’s Project Manager provided detailed crane drawings and wheel loads to the General Contractor. The metal building manufacturer used this information to design the building runway system.


The Results:


Crane-Tec supplied the customer with cutting edge cranes, providing safe, easy to operate means for maintaining their equipment.


Check out the project gallery!






47 views0 comments
bottom of page